Eco Builders completed a condominium roof replacement for Sian Ocean Residences Condominium Association Inc. at 4001 S Ocean Dr in Hollywood, Florida, re-roofing the concrete roof deck of the 16-story, 252-unit building. Completed in 2025, the project covered 17,500 SF of horizontal concrete roof deck, 3,700 SF of vertical parapet walls and vent enclosures, 900 LF of perimeter flashing, and 150 LF of roof vent flashing.
Sian Ocean Residences Condominium Roof Replacement
Project Type:
Sian Ocean Residences Condominium Roof Replacement
4001 S Ocean Dr
Hollywood, FL 33019
Latest Reviews
Professional Project Team
The entire team handled our tenant improvements with professionalism and precision. The finished space reflects our brand perfectly, and the process was efficient from beginning to end.
Reliable Construction Partner
We’ve completed multiple commercial construction projects with ECO Builders and continue to be impressed by their quality, responsiveness, and commitment to meeting deadlines.
Luxury Home Excellence
Building our custom home with ECO Builders was an outstanding experience. The craftsmanship, communication, and attention to every finish truly exceeded our expectations.
Design-Build Done Right
From initial planning through construction, the design-build process was smooth and well managed. Their team made complex decisions simple and kept the project moving.
Additional Information
Set directly along the Atlantic in Hollywood, Florida, Sian Ocean Residences takes on constant salt spray, high winds, and intense coastal sun, so its roof system has to perform under some of the toughest conditions in South Florida. When the association needed a long-term solution to protect its 16-story tower and 252 residences, ECO Builders was brought in to re-roof the building from the concrete deck up. Our team began by preparing the existing deck surface so the new system would bond properly and form a continuous, watertight barrier.
On an oceanfront high-rise, the edges and penetrations are often where water finds its way in, so we gave those details the same attention as the main roof field. Our crews carried the roofing system up the parapet walls and around the rooftop vent enclosures, then installed new flashing along the full roof perimeter and at every roof vent to seal the most vulnerable transitions. The finished rooftop gives the association a durable, weather-resistant system built to stand up to hurricane season and protect the building for years to come.

























