Eco Builders completed a commercial concrete restoration and structural rehabilitation project for Berkeley Diplomat Inc. at 900 Atlantic Shores Blvd in Hallandale Beach, Florida. Completed in 2026, the work covered the entire two-story, 62-unit building and included extensive structural work, installation of 40 new steel columns with supporting structural foundations, new electrical wiring around the building, new expansion joints throughout the building, and complete building painting.
Berkeley Diplomat Concrete Restoration & Structural Rehabilitation
Project Type:
Berkeley Diplomat Concrete Restoration & Structural Rehabilitation
900 Atlantic Shores Blvd
Hallandale Beach, Florida
Latest Reviews
Professional Project Team
The entire team handled our tenant improvements with professionalism and precision. The finished space reflects our brand perfectly, and the process was efficient from beginning to end.
Reliable Construction Partner
We’ve completed multiple commercial construction projects with ECO Builders and continue to be impressed by their quality, responsiveness, and commitment to meeting deadlines.
Luxury Home Excellence
Building our custom home with ECO Builders was an outstanding experience. The craftsmanship, communication, and attention to every finish truly exceeded our expectations.
Design-Build Done Right
From initial planning through construction, the design-build process was smooth and well managed. Their team made complex decisions simple and kept the project moving.
Additional Information
Berkeley Diplomat is a two-story, 62-unit building on Atlantic Shores Boulevard, where South Florida’s coastal climate puts constant stress on concrete and structural steel. Eco Builders treated the building as a whole rather than patching isolated areas. New structural supports were paired with repairs that tie the building’s systems back together, each new column sits on a foundation built to carry its load, and the new expansion joints let the structure move with heat and settling without cracking.
The work moved in sequence from structural repairs through electrical upgrades, and a full repaint finished the project in 2026. The gallery follows that progression across 66 project photographs. It also includes two existing-condition images from the original S-1 structural drawing that show the building before work began.